A project-led room for linear assets
Data Stack Global Bharat: Construction & Infrastructure is built around live programmes rather than products. Every session starts from a problem on a linear asset: a corridor, a metro alignment, a freight route, a canal.
Linear assets demand a radical shift in how survey data, ground conditions and real-time progress reporting are handled. The operational data driving performance across decades is crucial. This summit is built to lead that conversation.

The data has to serve both jobs
EPCs and PMCs are doing both jobs at once: delivering new lines while maintaining the last ones. The data decisions sit in the same place. The schema, survey cadence and sensors chosen on a new build decide how well it can be run in year seven, and lenders and InvITs read that record when an asset is refinanced. We want to bring together the people who build, run and fund these assets.
Topics of discussion
MAHARASHTRA'S LINEAR ASSETS
A selection of the state's major projects in each category. The room is built from the organisations that own, build and finance these assets.

- Samruddhi Mahamarg, Nagpur to Mumbai
- Shaktipeeth Mahamarg, Pavnar to Patradevi
- Pune-Nashik Industrial Corridor
- Nagpur-Chandrapur Expressway
- Jalna-Nanded Expressway
- Mumbai-Pune Expressway Missing Link
- Virar-Alibaug Multimodal Corridor
- Vadape to Thane eight-laning, NH-848
- Pimpalgaon-Nashik-Gonde six-laning
- Pune Ring Road, MSRDC
- PMRDA Ring Road
- Sant Dnyaneshwar Maharaj Palkhi Marg, NH-965
- Sant Tukaram Maharaj Palkhi Marg, NH-965G
- Versova-Bandra Sea Link
- Atal Setu, Mumbai Trans Harbour Link
- Mumbai Coastal Road

- Nagpur Metro Phase 2
- Nagpur Metro Phase 1
- Thane Integral Ring Metro
- Mumbai Metro Line 3, Aqua Line
- Mumbai Metro Line 2B
- Mumbai Metro Line 4 and Line 4A
- Mumbai Metro Line 5
- Mumbai Metro Line 6
- Mumbai Metro Line 9
- Mumbai Metro Line 2A and Line 7
- Navi Mumbai Metro Line 1
- Mumbai Metro Line 8, airport to airport
- Pune Metro
- Pune Metro Line 4, Kharadi to Khadakwasla

- Mumbai-Ahmedabad High Speed Rail
- Western Dedicated Freight Corridor

- Wainganga-Nalganga river link
- Gosikhurd project canal network
- Jigaon project
- Lower Dudhna Project

- Mumbai-Nagpur-Jharsuguda natural gas pipeline
- Marathwada Water Grid
- NMRDA sewerage, East and South zones

- Vadhavan Port
- Multi Modal Logistics Park, Sindi, Wardha
- MIHAN and the Nagpur SEZ
- Additional Butibori industrial area
- Dr Babasaheb Ambedkar International Airport, Nagpur
- AURIC, the DMIC node
Six sessions, one question each
Each session is built around a question a delegate asked, and closes on three actions for the first working day.
Speakers on the programme
Speakers listed alphabetically, by first name

Debasish Smrutiranjan
Vice President, Drone Operations & Geospatial EngineeringMonarch Surveyors & Engineering Consultants LtdPanel two · Running a line, not a plot
Sabyasachi Nayak
Vice President & Head, Design & Engineering Centre, RBF SBGLarsen & Toubro Limited, Transport Infrastructure ICPanel two · Running a line, not a plot
Satyanarayan Purohit
Vice President & HODDilip Buildcon LimitedOpening session · From break-fix to predicted
Vinod Kumar Agrawal
Director (Systems & Operations)Maharashtra Metro Rail Corporation LtdPanel one · Structure before softwareLinear asset categories in the room
The room, by sector and department
Register your interest to attend
Attendance is invitation-led. Tell us who you are and the programme desk confirms your seat directly. The full day, lunch and the evening reception are included.










